October 18, 2025 • F.W. Woolworth Co.
Drywall installation is underway at the Woolworth building, shaping hallways and rooms on the first floor.
Read moreOctober 17, 2025 • F.W. Woolworth Co.
First-floor insulation fills the wall framing at the Woolworth building as interior work continues.
Read moreOctober 16, 2025 • Peoples Bank
At the Peoples Bank building, crews are completing ductwork installation across the second floor.
Read moreOctober 15, 2025 • F.W. Woolworth Co.
Crews finish framing the Woolworth building’s west wall, including support around window openings.
Read moreOctober 14, 2025 • F.W. Woolworth Co.
Sections of ductwork are fitted between roof trusses for clean, efficient airflow at the Woolworth building.
Read moreOctober 13, 2025 • Peoples Bank
Plumbing crews route copper piping from the first to the second floor at the Peoples Bank building, readying the full plumbing system.
Read moreOctober 11, 2025 • Peoples Bank
The team installs wood door bucks throughout the Peoples Bank building—essential framing that sets the stage for precision door work.
Read moreOctober 10, 2025 • F.W. Woolworth Co.
Drywall delivery at the Woolworth building marks the next step in interior progress, with crews lifting sheets by crane to the second floor and staging them for installation once framing is complete.
Read moreOctober 9, 2025 • F.W. Woolworth Co.
Conduit installation progresses at the Woolworth building, ensuring safe and organized wiring before walls are enclosed.
Read moreOctober 7, 2025 • F.W. Woolworth Co.
Structural framing progresses inside the historic Woolworth building, bringing it one step closer to interior completion.
Read moreOctober 4, 2025 • Peoples Bank
Framing crews complete all interior metal framing at the Peoples Bank building, establishing a strong structure for the next stage of wall construction.
Read moreSeptember 30, 2025 • F.W. Woolworth Co.
Crews begin installing metal wall framing on the Woolworth building’s second floor, shaping its restored interior.
Read moreSeptember 26, 2025 • Peoples Bank
HVAC crews at the Peoples Bank building are cutting and installing ductwork sections on the second floor that will support the building’s future air system.
Read moreSeptember 25, 2025 • F.W. Woolworth Co.
Crews at the Woolworth building are framing the first floor to form stable walls for the next phase of restoration.
Read moreSeptember 24, 2025 • Peoples Bank
Crews at the Peoples Bank building are preparing to install junction boxes and wiring as part of the second floor electrical utility installation.
Read moreSeptember 23, 2025 • Brown Brothers
The first floor drywall at the Brown Brothers Building has been removed, exposing framing and the mechanical, electrical and plumbing systems for the structure’s next stage of restoration.
Read moreSeptember 22, 2025 • F.W. Woolworth Co.
A layer of concrete strengthens and soundproofs the Woolworth building’s second floor.
Read moreSeptember 20, 2025 • Peoples Bank
Progress continues inside the Peoples Bank building with HVAC airflow pathways secured and sealed.
Read moreSeptember 19, 2025 • 600 Block
From panels to conduits, all outdated electrical has been stripped from 635 Cleveland Street.
Read moreSeptember 18, 2025 • F.W. Woolworth Co.
To prevent leaks into the first floor, crews sealed openings before pouring the Woolworth building‘s second-floor concrete.
Read more