See daily progress on Historic Cleveland Street
MORE PHOTOS

Restoration teams have masked the space and are applying a protective shellac finish to the exposed wood elements inside the Telephone Building.

Read more
MORE PHOTOS

With underground plumbing work complete, crews have begun trench preparation, installing mesh and rebar to ready the Peoples Bank for a concrete pour-back.

Read more
MORE PHOTOS

Crews remove non-load-bearing steel support columns from the interior of 635 Cleveland Street, clearing the way for layout preparation and framing in the next stage of transformation.

Read more
MORE PHOTOS

Crews remove 26 second-floor doors from the Brown Brothers Building. Each door is labeled for restoration and future relocation.

Read more

Custom-stained oak wainscoting and crown molding are installed in the historic lobby of the Telephone Building, reinforcing the building’s original architectural character.

Read more
MORE PHOTOS

Crews remove large sections of wood framing inside the Brown Brothers Building, clearing the way for structural upgrades.

Read more
MORE PHOTOS

Crews start the process of removing interior stucco at Brown Brothers, revealing the wall structure beneath.

Read more
MORE PHOTOS

Crews remove all non-load-bearing studs inside 639 Cleveland Street, preparing for new framing and future renovations.

Read more
MORE PHOTOS

Crews remove demolition debris from the Brown Brothers Building, including wood, gypsum and plaster.

Read more
MORE PHOTOS

The elevator shaft at Peoples Bank was fully rebuilt with reinforced concrete block walls and a new foundation.

Read more
MORE PHOTOS

Second-floor decking has been removed at the F.W. Woolworth Co. building, exposing joists and clearing the way for structural repairs to correct decades of uneven flooring.

Read more
MORE PHOTOS

Crews demolished the outdated east stairwell at the Woolworth building and poured a new foundation to begin reconstructing it with concrete blocks.

Read more
MORE PHOTOS

Final paint work on the first floor of the Telephone Building brings the interior to completion, with all exposed beams now matched to the original color scheme.

Read more
MORE PHOTOS

New underground plumbing has been installed at the Peoples Bank building, including piping for restrooms, clearing the way for slab preparations and future tenant-ready infrastructure.

Read more
MORE PHOTOS

Crews uncovered signs of a long-forgotten fire during interior demolition at 635 Cleveland Street, revealing burn marks and charred framing above the ceiling and on the walls.

Read more
MORE PHOTOS

Crews are hand-staining the birch doors on the first floor of the Telephone Building, as part of the detailed interior finish work that is bringing the 1915 landmark in line with its carefully restored historic façade.

Read more
An exciting new chapter of historic restoration begins for four unique properties on Cleveland Street in Downtown Clearwater.