November 9, 2025 • Peoples Bank
Crews at the Peoples Bank building have installed the second-floor windows, marking a major step forward in the restoration process. Each historically accurate window was carefully set into the preinstalled frames and aligned to match the original proportions of the 1920s façade. The installation was carried out in pairs, with each window securely fastened and sealed before moving to the next. This process ensures both historical accuracy and modern performance, combining the look of the original structure with improved efficiency and durability. The completed installation brings the restoration one step closer to unveiling the building’s fully revitalized exterior.
Learn more about the full restoration plan for the Peoples Bank building.
February 16, 2026 • Peoples Bank
February 14, 2026 • Peoples Bank
February 12, 2026 • Peoples Bank
February 9, 2026 • Peoples Bank
February 7, 2026 • Peoples Bank
February 5, 2026 • Peoples Bank
February 2, 2026 • Peoples Bank
January 31, 2026 • Peoples Bank
January 29, 2026 • Peoples Bank
January 27, 2026 • Peoples Bank