See daily progress on Historic Cleveland Street
Crews continue interior demolition at 639 Cleveland Street, removing concrete masonry walls in preparation for new structural improvements and stair installation.
Read moreCrews remove a concrete column from the front façade of 639 Cleveland Street, clearing the structure for continued redevelopment and future improvements.
Read moreJuly 26, 2026 • 600 Block
Demolition findings at 629–633 Cleveland Street reveal hidden wall conditions, leading to targeted reinforcement work that strengthens the building’s future structure.
Read moreJuly 25, 2026 • Peoples Bank
The Peoples Bank exterior improvements continue with the installation of a new pedestrian walkway.
Read moreCrews install and compact paver base material along the Peoples Bank Building, preparing the sidewalk area for the next phase of streetscape improvements.
Read moreYears of patched and deteriorated concrete are being removed as the Peoples Bank Building restoration continues to transform the streetscape.
Read moreJuly 23, 2026 • Peoples Bank
New curb work is taking shape at Peoples Bank as construction crews install wooden forms to define the future concrete edge along the sidewalk.
Read moreJuly 22, 2026 • 600 Block
Dozens of A/C units are delivered to the 600 block site and staged for installation, marking continued progress on upgraded building systems.
Read moreCrews carefully dismantle the compromised west exterior wall at 639 Cleveland Street, combining hand demolition and heavy equipment to expose existing masonry conditions.
Read moreJuly 20, 2026 • 600 Block
A crane-assisted operation removes a concealed 45-foot steel beam from the 639 Cleveland Street façade, advancing demolition and preparing the building for its next phase of work.
Read moreCrews at 639 Cleveland Street have exposed the existing metal decking after removing the previous roof materials, allowing the team to prepare the surface for the next phase of roof installation.
Read moreJuly 18, 2026 • 600 Block
Crews remove accumulated roofing layers at 639 Cleveland Street, creating a clean surface for the installation of a new energy-efficient membrane system.
Read moreFaçade demolition at 639 Cleveland Street reveals a concealed steel support beam, documenting original construction methods.
Read moreRestoration craftsmen are preparing the Brown Brothers Building’s historic interior doors for refinishing, one careful pass at a time.
Read moreJuly 15, 2026 • 600 Block
Working from elevated platforms, demolition crews are carefully removing existing masonry sections as the building moves into its next phase of transformation.
Read moreSite preparation continues with the removal of existing steel beams, columns and framing on the 600 block.
Read moreA fabrication team uses CNC routing to prototype the three-dimensional aluminum composite panels planned for the exterior of 645 Cleveland Street.
Read moreExterior utility lines are coming down at the Brown Brothers Building as restoration work advances in downtown Clearwater.
Read moreJuly 11, 2026 • Brown Brothers
Original door hardware from the Brown Brothers Building is being cleaned and restored, including antique P. F. Corbin mortise locks dating as early as 1927.
Read moreRestoration crews are taking the next step in preserving the Brown Brothers Building by collecting mortar samples for expert analysis.
Read more