November 2, 2025 • F.W. Woolworth Co.
The Woolworth building’s upgraded plumbing system is coming together with new copper and plastic drainpipes installed throughout.
Read moreNovember 1, 2025 • F.W. Woolworth Co.
Crews at the Woolworth building are installing green and black wall tiles, recreating the time period-accurate bathroom design with precise detail.
Read moreOctober 30, 2025 • F.W. Woolworth Co.
Crews complete installation of the storefront at the Woolworth building, adding glass and entry doors that restore the building’s historic façade.
Read moreOctober 28, 2025 • F.W. Woolworth Co.
Crews complete exterior painting along the Woolworth building’s west wall, achieving a smooth, uniform finish that protects and enhances the façade.
Read moreOctober 27, 2025 • F.W. Woolworth Co.
Crews install historically accurate windows on the Woolworth building’s upper floor, completing a major step in restoring the façade’s original appearance.
Read moreOctober 26, 2025 • F.W. Woolworth Co.
Crews install drywall throughout the Woolworth building’s first floor, shaping walls for the retail areas and hallways as the interior restoration advances.
Read moreOctober 25, 2025 • Peoples Bank
Stairwell demolition makes way for framing that will support the second-floor offices at the Peoples Bank building.
Read moreOctober 24, 2025 • F.W. Woolworth Co.
Crews connect ductwork throughout the Woolworth building, forming the air-conditioning network that will carry air from the rooftop units through both floors.
Read moreOctober 23, 2025 • F.W. Woolworth Co.
Conduit installation marks a key step in completing the Woolworth building’s electrical infrastructure.
Read moreOctober 22, 2025 • F.W. Woolworth Co.
A liquid-applied barrier seals the Woolworth building storefront ahead of installation.
Read moreOctober 21, 2025 • Peoples Bank
The Peoples Bank building’s interior air system takes shape with new insulated ductwork.
Read moreOctober 20, 2025 • F.W. Woolworth Co.
Crews install drywall across the second floor of the Woolworth building, forming the walls and hallways that define the interior layout.
Read moreOctober 19, 2025 • Peoples Bank
Crews at the Peoples Bank building are preparing window openings for the installation of historically accurate replacements.
Read moreOctober 18, 2025 • F.W. Woolworth Co.
Drywall installation is underway at the Woolworth building, shaping hallways and rooms on the first floor.
Read moreOctober 17, 2025 • F.W. Woolworth Co.
First-floor insulation fills the wall framing at the Woolworth building as interior work continues.
Read moreOctober 16, 2025 • Peoples Bank
At the Peoples Bank building, crews are completing ductwork installation across the second floor.
Read moreOctober 15, 2025 • F.W. Woolworth Co.
Crews finish framing the Woolworth building’s west wall, including support around window openings.
Read moreOctober 14, 2025 • F.W. Woolworth Co.
Sections of ductwork are fitted between roof trusses for clean, efficient airflow at the Woolworth building.
Read moreOctober 13, 2025 • Peoples Bank
Plumbing crews route copper piping from the first to the second floor at the Peoples Bank building, readying the full plumbing system.
Read moreOctober 12, 2025 • F.W. Woolworth Co.
Crews prepare the window openings at the Woolworth building with window bucks and waterproofing primer to protect against moisture before installation begins.