The first floor of the Peoples Bank building is seeing progress as electrical crews continue installing ceiling conduits. These metal pathways protect wiring throughout the building and must be secured before electrical work can begin. Electricians use couplings to join each length and ensure a stable connection. This stage lays the groundwork for safe power distribution as restoration advances.