November 24, 2025 • F.W. Woolworth Co.
The coffered ceiling and wall edges at the Woolworth building are now being framed with period-appropriate dark wood trim.
Read moreNovember 23, 2025 • F.W. Woolworth Co.
Technicians install the sloped PVC drainage line for the Woolworth building rooftop AC units.
Read moreNovember 22, 2025 • F.W. Woolworth Co.
Electricians route and secure conduit across the second floor of the Woolworth building, creating the pathways for future wiring and lighting in the restored office space.
Read moreNovember 20, 2025 • F.W. Woolworth Co.
Crews finish drywall installation on the Woolworth building’s second floor, smoothing and sealing the walls to prepare the office spaces for paint and final finishes.
Read moreNovember 16, 2025 • F.W. Woolworth Co.
Historic color returns to the Woolworth building as crews complete interior painting in the lobby.
Read moreNovember 14, 2025 • F.W. Woolworth Co.
Detail work at the Woolworth building moves forward with storefront trim measured, cut and installed to match the historic design.
Read moreNovember 12, 2025 • F.W. Woolworth Co.
Crews install a historically accurate coffered tin ceiling at the Woolworth building, bringing to life a 1920s design element that decorates the building’s lobby.
Read moreNovember 10, 2025 • F.W. Woolworth Co.
Progress continues inside the Woolworth building as crews install drywall throughout the second-floor creative office space.
Read moreNovember 8, 2025 • F.W. Woolworth Co.
The F.W. Woolworth sign returns to downtown Clearwater, marking a proud milestone in the historic restoration efforts.
Read moreNovember 6, 2025 • F.W. Woolworth Co.
The Woolworth building’s first-floor walls are taking shape as crews start the drywall finishing process.
Read moreNovember 5, 2025 • F.W. Woolworth Co.
Crews install recycled denim insulation on the Woolworth building’s second floor, ensuring a safe, sustainable and well-insulated office environment.
Read moreNovember 4, 2025 • F.W. Woolworth Co.
The Woolworth building’s façade gets a fresh finish, highlighting the craftsmanship of its 1928 architecture.
Read moreNovember 2, 2025 • F.W. Woolworth Co.
The Woolworth building’s upgraded plumbing system is coming together with new copper and plastic drainpipes installed throughout.
Read moreNovember 1, 2025 • F.W. Woolworth Co.
Crews at the Woolworth building are installing green and black wall tiles, recreating the time period-accurate bathroom design with precise detail.
Read moreOctober 31, 2025 • F.W. Woolworth Co.
Scaffolding is up at the Woolworth building’s south side where crews apply stucco to the wall.
Read moreOctober 30, 2025 • F.W. Woolworth Co.
Crews complete installation of the storefront at the Woolworth building, adding glass and entry doors that restore the building’s historic façade.
Read moreOctober 28, 2025 • F.W. Woolworth Co.
Crews complete exterior painting along the Woolworth building’s west wall, achieving a smooth, uniform finish that protects and enhances the façade.
Read moreOctober 27, 2025 • F.W. Woolworth Co.
Crews install historically accurate windows on the Woolworth building’s upper floor, completing a major step in restoring the façade’s original appearance.
Read moreOctober 26, 2025 • F.W. Woolworth Co.
Crews install drywall throughout the Woolworth building’s first floor, shaping walls for the retail areas and hallways as the interior restoration advances.
Read moreOctober 24, 2025 • F.W. Woolworth Co.
Crews connect ductwork throughout the Woolworth building, forming the air-conditioning network that will carry air from the rooftop units through both floors.
Read more