See daily progress on Historic Cleveland Street
October 16, 2026 • 600 Block
The foundation work at 639 Cleveland Street now includes reinforcing steel that will tie the new wall footings into the existing structure.
Read moreOctober 15, 2026 • 600 Block
Crews are measuring, positioning and securing shaft-wall liner panels within specialized metal framing at 623–627 Cleveland Street to create continuous fire-rated wall assemblies.
Read moreOctober 14, 2026 • 600 Block
Light-gauge metal framing now defines the new interior layout at 623–627 Cleveland Street, preparing the building for upcoming mechanical, electrical and plumbing work.
Read moreOctober 13, 2026 • 600 Block
Drilling the existing column footings creates the structural connection needed for new reinforced masonry walls at 639 Cleveland Street.
Read moreOctober 13, 2026 • 600 Block
The new sloped structural elements now define the redesigned front portion of 623–627 Cleveland Street as reconstruction advances.
Read moreOctober 11, 2026 • 600 Block
Surveying and staking establish the locations for new foundations and walls at 645 Cleveland Street as site preparation moves into layout.
Read moreOctober 10, 2026 • 600 Block
Crews roll, bond and fit the new roofing layer across the prepared deck, bringing 623–627 Cleveland Street closer to a weather-tight enclosure.
Read moreOctober 9, 2026 • 600 Block
From positioning individual boards to building out the roof assembly, insulation installation is progressing at 623–627 Cleveland Street.
Read moreOctober 8, 2026 • 600 Block
The reconstructed front walls at 629–633 Cleveland Street will frame the large, open storefront entrance planned for the renovated building.
Read moreOctober 7, 2026 • 600 Block
New wood forms are being set in the former wall footing locations at 639 Cleveland Street to prepare for reinforced masonry construction.
Read moreOctober 6, 2026 • 600 Block
At 639 Cleveland Street, demolition crews are breaking apart the former wall foundation to clear the footprint for new reinforced masonry.
Read moreOctober 5, 2026 • 600 Block
The roof framing at 623–627 Cleveland Street receives additional wood blocking as preparation continues for future building equipment.
Read moreOctober 5, 2026 • 600 Block
Corrugated metal decking is being measured, positioned and secured along the sloped soffit at 623–627 Cleveland Street.
Read moreOctober 3, 2026 • 600 Block
Roofing insulation is delivered and staged on the new plywood deck at 623–627 Cleveland Street as preparation for the new roof system continues.
Read moreOctober 2, 2026 • 600 Block
Wood formwork is being cut and installed at the front of 623–627 Cleveland Street to prepare for a new reinforced concrete beam.
Read moreThe rebuilt parapet at 623–627 Cleveland Street is now grouted solid, completing another stage of the masonry reconstruction.
Read moreSeptember 30, 2026 • 600 Block
Reinforced concrete masonry units are being installed at 623–627 Cleveland Street to rebuild the parapet wall, with reinforcing steel incorporated into the masonry assembly.
Read moreSeptember 29, 2026 • 600 Block
Concrete has been placed into the prepared footing forms at 629–633 Cleveland Street, completing the new structural footings that will support future building work.
Read moreSeptember 28, 2026 • 600 Block
From measuring individual bars to securing them with tie wire, crews are preparing and installing reinforcement for new footings.
Read moreSeptember 27, 2026 • 600 Block
Angled steel beams are installed at the front entrance of 623–627 Cleveland Street, forming the framework for the redesigned raised and sloped entry.
Read more