Removal of the existing canopy at 629–633 Cleveland Street reveals former structural layers and prepares the storefront for its new curved entryway.

Read more
MORE PHOTOS

The front façade at 623–627 Cleveland Street is being carefully cleared for the next stage of work.

Read more
MORE PHOTOS

Visible progress continues on the 600 block: the roof at 629–633 Cleveland Street has been opened up for full replacement.

Read more
MORE PHOTOS

Roof deck removal clears the way for new decking and a watertight roof membrane at 623–627 Cleveland Street.

Read more
MORE PHOTOS

A new phase of demolition is underway as crews prepare the building for safe roof removal operations.

Read more
MORE PHOTOS

Truckloads of concrete debris leave the 600 block site as crews advance preparations for reconstruction. The work marks another step toward bringing new retail, dining and service spaces to downtown Clearwater.

Read more
MORE PHOTOS

Inspections behind the 600 block focus on utility poles that will be temporarily removed during redevelopment activities.

Read more
MORE PHOTOS

Contractors begin removing aging roofing materials and roof decking at 623–627 Cleveland Street, marking another step in the building’s renovation.

Read more
MORE PHOTOS

Site preparation continues on the 600 block with floor slab demolition underway at 635 Cleveland Street.

Read more
MORE PHOTOS

The removal of the existing overhang clears the way for the planned transformation of 623–627 Cleveland Street.

Read more
MORE PHOTOS

Pedestrian pathways on the 600 block are cleared of existing pavers to prepare for cleaning and restoration.

Read more
MORE PHOTOS

The 600 block continues its major phase of demolition, opening each property for new construction.

Read more
MORE PHOTOS

Large-format graphics are installed along the 600 block construction fencing, presenting a cohesive visual preview of the redeveloped Cleveland Street corridor.

Read more
MORE PHOTOS

Materials are cut, cleared and consolidated as 635 Cleveland Street transitions from demolition into its next phase.

Read more
MORE PHOTOS

Crews remove masonry and wall sections along the rear of 635 Cleveland Street, exposing underlying structural elements for reconstruction.

Read more
MORE PHOTOS

Interior and exterior demolition are underway at 629–633 Cleveland Street, clearing the way for a rebuilt storefront system.

Read more
MORE PHOTOS

Exterior demolition progresses as storefront systems are cleared at 625–627 Cleveland Street.

Read more
MORE PHOTOS

Knee wall demolition at 629–633 Cleveland Street opens the storefront, improving visibility from the street level and creating a more accessible interior layout.

Read more
MORE PHOTOS

From panels to conduits, all outdated electrical has been stripped from 635 Cleveland Street.

Read more
MORE PHOTOS

High-ceiling drywall removal reveals roof trusses at 635 Cleveland Street.