August 24, 2025 • Peoples Bank
In a climate where heavy rainfall is common, a reliable drainage system is essential to protect both the roof and the building itself. Plumbing contractors have completed installation of the storm drainpipe system at the Peoples Bank building, including new roof drains. Made of durable black cast iron, the system is designed to carry rainwater efficiently away from the structure. This marks a key infrastructure upgrade in the ongoing restoration of the 1910 landmark.
Learn more about the full restoration plan for the Peoples Bank building.
January 31, 2026 • Peoples Bank
January 29, 2026 • Peoples Bank
January 27, 2026 • Peoples Bank
January 26, 2026 • Peoples Bank
January 24, 2026 • Peoples Bank
January 22, 2026 • Peoples Bank
January 20, 2026 • Peoples Bank
January 18, 2026 • Peoples Bank
January 16, 2026 • Peoples Bank
January 14, 2026 • Peoples Bank