December 21, 2025 • Peoples Bank
Work continues on the Peoples Bank building as steel ledges prepare the façade for mosaic tiles.
Read moreDecember 13, 2025 • F.W. Woolworth Co.
Crews installed new period-style windows along the west side of the Woolworth building, securing each unit and sealing them for long-term protection.
Read moreDecember 11, 2025 • Peoples Bank
The Peoples Bank building’s Mediterranean Revival tile design is being mapped across the east façade.
Read moreDecember 1, 2025 • F.W. Woolworth Co.
Restoration continues at the Woolworth building with trim added to the southwest entry.
Read moreNovember 14, 2025 • F.W. Woolworth Co.
Detail work at the Woolworth building moves forward with storefront trim measured, cut and installed to match the historic design.
Read moreNovember 9, 2025 • Peoples Bank
Crews install historically accurate second-floor windows at the Peoples Bank building, combining authentic design with modern performance in a major step toward the project’s completion.
Read moreNovember 8, 2025 • F.W. Woolworth Co.
The F.W. Woolworth sign returns to downtown Clearwater, marking a proud milestone in the historic restoration efforts.
Read moreNovember 7, 2025 • Peoples Bank
Step by step, the Peoples Bank restoration moves forward with precise window framing and sealing.
Read moreNovember 4, 2025 • F.W. Woolworth Co.
The Woolworth building’s façade gets a fresh finish, highlighting the craftsmanship of its 1928 architecture.
Read moreOctober 30, 2025 • F.W. Woolworth Co.
Crews complete installation of the storefront at the Woolworth building, adding glass and entry doors that restore the building’s historic façade.
Read moreOctober 28, 2025 • F.W. Woolworth Co.
Crews complete exterior painting along the Woolworth building’s west wall, achieving a smooth, uniform finish that protects and enhances the façade.
Read moreOctober 27, 2025 • F.W. Woolworth Co.
Crews install historically accurate windows on the Woolworth building’s upper floor, completing a major step in restoring the façade’s original appearance.
Read moreOctober 22, 2025 • F.W. Woolworth Co.
A liquid-applied barrier seals the Woolworth building storefront ahead of installation.
Read moreOctober 19, 2025 • Peoples Bank
Crews at the Peoples Bank building are preparing window openings for the installation of historically accurate replacements.
Read moreOctober 12, 2025 • F.W. Woolworth Co.
Crews prepare the window openings at the Woolworth building with window bucks and waterproofing primer to protect against moisture before installation begins.
Read moreOctober 1, 2025 • Peoples Bank
Crews construct the recessed east entry of the Peoples Bank building with reinforced concrete block and cement.
Read moreSeptember 13, 2025 • F.W. Woolworth Co.
Crews apply a stucco coat with reinforcing mesh on the Woolworth building’s west wall to ensure durability and crack resistance.
Read moreSeptember 5, 2025 • F.W. Woolworth Co.
Restoration continues at the Woolworth Building as parapet sheathing creates a base for fresh stucco.
Read moreSeptember 1, 2025 • Peoples Bank
Boyd’s Clocks secured the historic clock brackets to the Peoples Bank, ensuring long-term stability for the landmark feature.
August 19, 2025 • F.W. Woolworth Co.
Masons have laid concrete block and begun installing the brick façade on the Woolworth building, ensuring it matches the historic appearance of the structure.
Read more