October 26, 2025 • F.W. Woolworth Co.
Crews install drywall throughout the Woolworth building’s first floor, shaping walls for the retail areas and hallways as the interior restoration advances.
Read moreOctober 20, 2025 • F.W. Woolworth Co.
Crews install drywall across the second floor of the Woolworth building, forming the walls and hallways that define the interior layout.
Read moreOctober 17, 2025 • F.W. Woolworth Co.
First-floor insulation fills the wall framing at the Woolworth building as interior work continues.
Read moreOctober 15, 2025 • F.W. Woolworth Co.
Crews finish framing the Woolworth building’s west wall, including support around window openings.
Read moreOctober 12, 2025 • F.W. Woolworth Co.
Crews prepare the window openings at the Woolworth building with window bucks and waterproofing primer to protect against moisture before installation begins.
Read moreOctober 10, 2025 • F.W. Woolworth Co.
Drywall delivery at the Woolworth building marks the next step in interior progress, with crews lifting sheets by crane to the second floor and staging them for installation once framing is complete.
Read moreOctober 9, 2025 • F.W. Woolworth Co.
Conduit installation progresses at the Woolworth building, ensuring safe and organized wiring before walls are enclosed.
Read moreOctober 7, 2025 • F.W. Woolworth Co.
Structural framing progresses inside the historic Woolworth building, bringing it one step closer to interior completion.
Read moreThe back entryway takes shape at the Woolworth building as concrete crews seal the steel-framed structure for lasting stability.
Read moreOctober 5, 2025 • F.W. Woolworth Co.
Behind the F.W. Woolworth building, crews lift new AC units onto the roof preparing for the next phase of HVAC installation.
Read moreSeptember 18, 2025 • F.W. Woolworth Co.
To prevent leaks into the first floor, crews sealed openings before pouring the Woolworth building‘s second-floor concrete.
Read moreSeptember 13, 2025 • F.W. Woolworth Co.
Crews apply a stucco coat with reinforcing mesh on the Woolworth building’s west wall to ensure durability and crack resistance.
Read moreTrusses connecting the Woolworth stairwell towers to the second floor are secured in place, preparing the building for decking installation.
Read moreAugust 4, 2025 • F.W. Woolworth Co.
From poured footings to roof bond beams, the Woolworth building's stairwells are structurally sound and complete.
Read moreJuly 22, 2025 • F.W. Woolworth Co.
A concrete beam is installed at the F.W. Woolworth Co. building to stabilize the south wall—essential groundwork for more restoration to come.
Read moreJuly 20, 2025 • F.W. Woolworth Co.
Crews complete interior steel installation at the F. W. Woolworth Co. building, forming the framework for new roof trusses and stabilizing the structure in preparation for roof construction.
Read moreJuly 14, 2025 • F.W. Woolworth Co.
Work is progressing at the historic F.W. Woolworth Co. building with the start of construction of the storefront soffit, the horizontal ceiling enclosures above each recessed storefront entrance.
Read moreJuly 11, 2025 • F.W. Woolworth Co.
Crews are installing new second-floor steel beams at the Woolworth building, which is a major structural phase that supports the future roof restoration.
Read moreJuly 2, 2025 • F.W. Woolworth Co.
Crews are removing temporary interior shoring from the first and second floors of the Woolworth Building.
Read moreCrews start building the elevator shaft at the Woolworth building, with the first course of reinforced concrete block ready for concrete infill.
Read more