July 15, 2025 • Brown Brothers
Crews remove 26 second-floor doors from the Brown Brothers Building. Each door is labeled for restoration and future relocation.
Read moreJuly 10, 2025 • Brown Brothers
Crews cut down old fiberglass-lined ducts inside the Brown Brothers Building, taking big steps toward a modern HVAC setup.
Read moreJuly 3, 2025 • Brown Brothers
Crews remove large sections of wood framing inside the Brown Brothers Building, clearing the way for structural upgrades.
Read moreCrews start the process of removing interior stucco at Brown Brothers, revealing the wall structure beneath.
Read moreJune 16, 2025 • Brown Brothers
Crews remove the interior walls at the Brown Brothers Building to reveal the original framework.
Read moreThe interior storefront of the Brown Brothers Building has been removed, opening space for a newly designed entry system as part of ongoing renovations.
Read moreMay 30, 2025 • Brown Brothers
Paint removal continues at the Brown Brothers Building. Crews discovered that much of the front façade brick remains unpainted, and it will be preserved in its original state.
Read moreMay 25, 2025 • Brown Brothers
Using a special compound, crews are carefully removing layers of old paint from the original brick façade of the Brown Brothers Building, revealing its historic masonry for the first time in decades.
Read moreInterior demolition has begun at the Brown Brothers Building, clearing the way for the preservation of original 1924 doors, transoms and wood casings.
Read more