See daily progress on Historic Cleveland Street
MORE PHOTOS

Old ducts and compressors are gone as another 600 Block structure is prepared for renewal.

Read more
MORE PHOTOS

Crews remove all fiberglass insulation from 639 Cleveland Street as part of the full interior demolition, clearing the way for sustainable material upgrades in the building’s renovation phase.

Read more
MORE PHOTOS

Crews remove the floor tile at 623 Cleveland Street to expose the subfloor and allow for detailed architectural assessments ahead of interior layout design.

Read more
MORE PHOTOS

Crews remove ceramic floor tile at 635 Cleveland Street, exposing the underlying concrete slab in preparation for finish work.

Read more
MORE PHOTOS

Crews remove the back structure and all of the remaining studs at 635 Cleveland Street.

Read more
MORE PHOTOS

Crews remove all non-load-bearing studs inside 639 Cleveland Street, preparing for new framing and future renovations.

Read more
MORE PHOTOS

All bathrooms and plumbing systems are removed at 635 Cleveland Street, clearing the way for installation of new copper plumbing.

Read more
MORE PHOTOS

After extensive interior demolition, the lead architect conducted a full walkthrough of the 600 Block to document exposed structural features and finalize the restoration plans.

Read more
MORE PHOTOS

Demolition crews uncover a heavy safe inside 645 Cleveland Street, dating back to the early 1900s and adding a new layer of discovery to the ongoing renovation.

Read more
An exciting new chapter of historic restoration begins for four unique properties on Cleveland Street in Downtown Clearwater.
See the magnificent transformation now underway