See daily progress on Historic Cleveland Street
MORE PHOTOS

Crews install recycled denim insulation on the Woolworth building’s second floor, ensuring a safe, sustainable and well-insulated office environment.

Read more
MORE PHOTOS

The Woolworth building’s upgraded plumbing system is coming together with new copper and plastic drainpipes installed throughout.

Read more
MORE PHOTOS

Crews at the Woolworth building are installing green and black wall tiles, recreating the time period-accurate bathroom design with precise detail.

Read more
MORE PHOTOS

Scaffolding is up at the Woolworth building’s south side where crews apply stucco to the wall.

Read more
MORE PHOTOS

Crews complete installation of the storefront at the Woolworth building, adding glass and entry doors that restore the building’s historic façade.

Read more
MORE PHOTOS

Crews connect ductwork throughout the Woolworth building, forming the air-conditioning network that will carry air from the rooftop units through both floors.

Read more
MORE PHOTOS

Conduit installation marks a key step in completing the Woolworth building’s electrical infrastructure.

Read more
MORE PHOTOS

Drywall installation is underway at the Woolworth building, shaping hallways and rooms on the first floor.

Read more
MORE PHOTOS

Historic yellow brick was used to reconstruct the second-floor window openings at the Woolworth building.

Read more
MORE PHOTOS

Crews begin installing metal wall framing on the Woolworth building’s second floor, shaping its restored interior.

Read more
MORE PHOTOS

Teams weld the Woolworth building’s awning into place, creating a shelter for the restored entrance.

Read more
MORE PHOTOS

Crews at the Woolworth building are framing the first floor to form stable walls for the next phase of restoration.

Read more
MORE PHOTOS

Brick repairs at the Woolworth building prepare the structure for historically accurate window installation.

Read more
MORE PHOTOS

Raised wood curbs installed on the Woolworth Building roof will secure skylights and improve efficiency.

Read more
MORE PHOTOS

Wooden trusses are lifted by crane and secured atop the Woolworth building, preparing the structure for decking and installation of a durable waterproof roof.

Read more
MORE PHOTOS

Masons have laid concrete block and begun installing the brick façade on the Woolworth building, ensuring it matches the historic appearance of the structure.

Read more
MORE PHOTOS

Restoration crews rebuilt the south parapet of the F.W. Woolworth Co. building, adding a continuous bonding beam and installing framing to support sheathing and stucco.

Read more
MORE PHOTOS

Crews are removing selected storefront bricks from Woolworth to prepare for replacement masonry that blends seamlessly.

Read more
MORE PHOTOS

Crews remove damaged bricks in preparation for the Woolworth sign, just above the new storefront.

Read more
MORE PHOTOS

Crews remove the south parapet at the F.W. Woolworth Building to make way for a structural bond beam.

Read more
An exciting new chapter of historic restoration begins for four unique properties on Cleveland Street in Downtown Clearwater.
See the magnificent transformation now underway