November 5, 2025 • F.W. Woolworth Co.
Crews install recycled denim insulation on the Woolworth building’s second floor, ensuring a safe, sustainable and well-insulated office environment.
Read moreNovember 2, 2025 • F.W. Woolworth Co.
The Woolworth building’s upgraded plumbing system is coming together with new copper and plastic drainpipes installed throughout.
Read moreNovember 1, 2025 • F.W. Woolworth Co.
Crews at the Woolworth building are installing green and black wall tiles, recreating the time period-accurate bathroom design with precise detail.
Read moreOctober 31, 2025 • F.W. Woolworth Co.
Scaffolding is up at the Woolworth building’s south side where crews apply stucco to the wall.
Read moreOctober 30, 2025 • F.W. Woolworth Co.
Crews complete installation of the storefront at the Woolworth building, adding glass and entry doors that restore the building’s historic façade.
Read moreOctober 24, 2025 • F.W. Woolworth Co.
Crews connect ductwork throughout the Woolworth building, forming the air-conditioning network that will carry air from the rooftop units through both floors.
Read moreOctober 23, 2025 • F.W. Woolworth Co.
Conduit installation marks a key step in completing the Woolworth building’s electrical infrastructure.
Read moreOctober 18, 2025 • F.W. Woolworth Co.
Drywall installation is underway at the Woolworth building, shaping hallways and rooms on the first floor.
Read moreOctober 3, 2025 • F.W. Woolworth Co.
Historic yellow brick was used to reconstruct the second-floor window openings at the Woolworth building.
Read moreSeptember 30, 2025 • F.W. Woolworth Co.
Crews begin installing metal wall framing on the Woolworth building’s second floor, shaping its restored interior.
Read moreSeptember 29, 2025 • F.W. Woolworth Co.
Teams weld the Woolworth building’s awning into place, creating a shelter for the restored entrance.
Read moreSeptember 25, 2025 • F.W. Woolworth Co.
Crews at the Woolworth building are framing the first floor to form stable walls for the next phase of restoration.
Read moreSeptember 15, 2025 • F.W. Woolworth Co.
Brick repairs at the Woolworth building prepare the structure for historically accurate window installation.
Read moreSeptember 8, 2025 • F.W. Woolworth Co.
Raised wood curbs installed on the Woolworth Building roof will secure skylights and improve efficiency.
Read moreWooden trusses are lifted by crane and secured atop the Woolworth building, preparing the structure for decking and installation of a durable waterproof roof.
Read moreAugust 19, 2025 • F.W. Woolworth Co.
Masons have laid concrete block and begun installing the brick façade on the Woolworth building, ensuring it matches the historic appearance of the structure.
Read moreRestoration crews rebuilt the south parapet of the F.W. Woolworth Co. building, adding a continuous bonding beam and installing framing to support sheathing and stucco.
Read moreAugust 11, 2025 • F.W. Woolworth Co.
Crews are removing selected storefront bricks from Woolworth to prepare for replacement masonry that blends seamlessly.
Read more
Crews remove damaged bricks in preparation for the Woolworth sign, just above the new storefront.
July 6, 2025 • F.W. Woolworth Co.
Crews remove the south parapet at the F.W. Woolworth Building to make way for a structural bond beam.
Read more