September 25, 2025 • F.W. Woolworth Co.
Framing is underway on the first floor of the Woolworth building. Crews are installing top, bottom and vertical metal framing to form a sturdy skeleton for the building’s walls. Using lifts, crews can reach the higher wall sections.
Once the initial framing is in place, crews install steel bars that run through the prepunched holes in the vertical framing studs. These bars prevent twisting or buckling over time and ensure the stability of the walls in this expansive space.
Learn more about the full restoration plan for the F.W. Woolworth Co. building.
September 22, 2025 • F.W. Woolworth Co.
September 21, 2025 • F.W. Woolworth Co.
September 18, 2025 • F.W. Woolworth Co.
September 13, 2025 • F.W. Woolworth Co.
September 11, 2025 • F.W. Woolworth Co.
September 8, 2025 • F.W. Woolworth Co.
September 5, 2025 • F.W. Woolworth Co.
September 2, 2025 • F.W. Woolworth Co.
August 30, 2025 • F.W. Woolworth Co.