Get updates as new projects and events unfold
Receive updates on new developments, events and announcements as they happen.
A confirmation email has been sent to your inbox. If you do not receive it shortly, please check your spam or junk folder.
FOR IMMEDIATE RELEASE
New Video Takes Viewers Inside TK Architects to Reveal How Engineers Will Keep Audiences Cool—While Making the Air-Conditioning Virtually Invisible
At Clearwater’s future EVO Family Entertainment Center, one of the most demanding engineering challenges comes with a simple goal: keep moviegoers cool without letting them see—or hear—the air-conditioning.
And when the main auditorium is being designed around a screen more than 130 feet wide, that is no small undertaking.
A new Cleveland Street Alliance video, EVO Behind the Scenes: Stay Cool, takes viewers inside TK Architects in Kansas City, where Levi Lawson, a principal and a mechanical, electrical and plumbing engineer, reveals the systems being designed for Clearwater’s $50 million entertainment destination.
“My role in making the entertainment center a reality is making it cool for you in the summer when you want to come in and enjoy a movie,” Lawson explains.
The project presents an extraordinary challenge. At the heart of its seven-auditorium multiplex is Auditorium One, designed around what is planned to be the largest cinema screen on Earth.
Unlike conventional projects, where architects and engineers may have flexibility in arranging a building’s systems, the dimensions of EVO’s flagship auditorium have shaped much of the surrounding design.
Making it all work requires close coordination among architects, engineers and specialists to create what Lawson calls “the crowning jewel of this project.”
The video follows Lawson as he uses his “handy-dandy ductulator” to calculate the size of air ducts, then walks viewers through three-dimensional plans showing how cooled air will circulate throughout the building.
But perhaps the greatest challenge is making all that engineering disappear.
Inside Auditorium One, the distinctive scalloped ceiling features linear lighting. Rather than interrupting the design with conventional air-conditioning grilles, the engineering team is planning long, narrow air outlets that follow the lighting profiles, blending the cooling system into the architecture.
For Lawson, the goal is to make the system virtually invisible.
“You’re never going to see it. You’re never going to notice it because it’s operating in stealth. The HVAC system will be the stealth fighter of the auditorium.”
The approximately 83,000-square-foot EVO Family Entertainment Center is planned as a major entertainment anchor at the eastern gateway to Cleveland Street—part of the sweeping restoration and redevelopment transforming downtown Clearwater.
From the intricate systems above the ceilings to the carefully calculated flow of air throughout the auditoriums, every detail is being engineered around a single objective: an extraordinary experience for the audience.
And Lawson has a parting message for the city:
“Clearwater, I hope you appreciated the inside look. Stay cool.”
The new video, EVO Behind the Scenes: Stay Cool, is available at clevelandstreetalliance.com.
Cleveland Street Alliance is leading a coordinated effort to revitalize downtown Clearwater through a series of historic restoration and redevelopment projects along Cleveland Street. Through sustained investment and a building-by-building approach, the initiative is restoring landmark properties, reactivating the corridor and reestablishing the district as a center of activity and commerce.
To learn more, visit clevelandstreetalliance.com.
Email: mediarelations@clevelandstreetalliance.com
Phone Number: (727) 362-7000