July 5, 2025 • 600 Block
View of the back of 635 Cleveland Street during full structural removal.
Interior demolition at 635 Cleveland Street included the removal of the building’s back structure. Crews cleared out the remaining wall studs and framing, preparing the site for new structural work in line with architectural designs. The completed plans will reflect a new structural layout while preserving the building’s downtown historic presence.
Learn more about the full restoration plans for the 600 Block.
August 9, 2025 • 600 Block
July 23, 2025 • 600 Block
July 17, 2025 • 600 Block
July 13, 2025 • 600 Block