September 19, 2025 • 600 Block
From panels to conduits, all outdated electrical has been stripped from 635 Cleveland Street.
Read moreSeptember 16, 2025 • 600 Block
High-ceiling drywall removal reveals roof trusses at 635 Cleveland Street.
Read moreSeptember 14, 2025 • 600 Block
Crews remove foam insulation from the ceiling at 635 Cleveland Street, exposing roof trusses.
Read moreSeptember 12, 2025 • 600 Block
Environmental concerns guided the removal of refrigerant before the vents and ductwork were demolished at 635 Cleveland Street.
Read moreSeptember 4, 2025 • 600 Block
The interior floor slab at 635 Cleveland Street is demolished and removed to clear the ground floor.
Read moreAugust 31, 2025 • 600 Block
The kitchen hood and ductwork at 635 Cleveland Street have been removed, preparing the space for renovation.
Read moreAugust 25, 2025 • 600 Block
Structural truss removal marks a major interior demolition milestone in the renovation of 635 Cleveland Street.
Read moreAugust 21, 2025 • 600 Block
Crews removed sections of brick at 635 Cleveland Street to examine the building’s integrity, revealing structural concerns that require stabilization.
Read moreAugust 17, 2025 • 600 Block
Truss inspections begin as crews remove the ceiling at 635 Cleveland Street.
Read moreAugust 14, 2025 • 600 Block
Sound- and temperature-insulated plumbing is removed from the upstairs of 639 Cleveland Street.
Read moreAnother layer of demolition completes, preparing the interior for its next stage of construction.
Read moreAugust 5, 2025 • 600 Block
After stripping drywall and stucco, demolition crews removed the entire wood framing system inside 635 Cleveland Street.
Read moreAugust 1, 2025 • 600 Block
The recessed back entry at 635 Cleveland is demolished, opening up more usable space under the former mezzanine.
Read moreJuly 27, 2025 • 600 Block
Old ducts and compressors are gone as another 600 Block structure is prepared for renewal.
Read moreCrews remove non-load-bearing steel support columns from the interior of 635 Cleveland Street, clearing the way for layout preparation and framing in the next stage of transformation.
Read moreJuly 17, 2025 • 600 Block
Crews remove all fiberglass insulation from 639 Cleveland Street as part of the full interior demolition, clearing the way for sustainable material upgrades in the building’s renovation phase.
Read moreJuly 13, 2025 • 600 Block
Crews remove the floor tile at 623 Cleveland Street to expose the subfloor and allow for detailed architectural assessments ahead of interior layout design.
Read moreJuly 9, 2025 • 600 Block
Crews remove ceramic floor tile at 635 Cleveland Street, exposing the underlying concrete slab in preparation for finish work.
Read moreJuly 5, 2025 • 600 Block
Crews remove the back structure and all of the remaining studs at 635 Cleveland Street.
Read moreJuly 1, 2025 • 600 Block
Crews remove the outer brick from the chimney, uncovering the original brickwork.
Read more