After stripping drywall and stucco, demolition crews removed the entire wood framing system inside 635 Cleveland Street.

Read more
MORE PHOTOS

The recessed back entry at 635 Cleveland is demolished, opening up more usable space under the former mezzanine.

Read more
MORE PHOTOS

Old ducts and compressors are gone as another 600 Block structure is prepared for renewal.

Read more
MORE PHOTOS

Crews remove non-load-bearing steel support columns from the interior of 635 Cleveland Street, clearing the way for layout preparation and framing in the next stage of transformation.

Read more
MORE PHOTOS

Crews remove all fiberglass insulation from 639 Cleveland Street as part of the full interior demolition, clearing the way for sustainable material upgrades in the building’s renovation phase.

Read more
MORE PHOTOS

Crews remove the floor tile at 623 Cleveland Street to expose the subfloor and allow for detailed architectural assessments ahead of interior layout design.

Read more
MORE PHOTOS

Crews remove ceramic floor tile at 635 Cleveland Street, exposing the underlying concrete slab in preparation for finish work.

Read more
MORE PHOTOS

Crews remove the back structure and all of the remaining studs at 635 Cleveland Street.

Read more
MORE PHOTOS

Crews remove the outer brick from the chimney, uncovering the original brickwork.

Read more
MORE PHOTOS

Crews remove all non-load-bearing studs inside 639 Cleveland Street, preparing for new framing and future renovations.

Read more
MORE PHOTOS

Crews remove the outdated tile floor inside 629 Cleveland Street, setting the stage for upcoming renovation work.

Read more
MORE PHOTOS

All bathrooms and plumbing systems are removed at 635 Cleveland Street, clearing the way for installation of new copper plumbing.

Read more

During interior demolition at 635 Cleveland Street, crews removed old carpet, exposing the concrete slab beneath.

Read more
MORE PHOTOS

Crews removed the old carpet from 629 Cleveland Street, uncovering the original tile floor beneath as part of early stage demolition.

Read more
MORE PHOTOS

AC coils were removed at 639 Cleveland Street and refrigerant was recovered at 645, completing an environmentally responsible phase of demolition.

Read more
MORE PHOTOS

After extensive interior demolition, the lead architect conducted a full walkthrough of the 600 Block to document exposed structural features and finalize the restoration plans.

Read more

Crews completed safe refrigerant removal from 629 Cleveland Street’s HVAC systems, preventing environmental release and clearing the way for sustainable upgrades.

Read more
MORE PHOTOS

Demolition crews uncover a heavy safe inside 645 Cleveland Street, dating back to the early 1900s and adding a new layer of discovery to the ongoing renovation.

Read more
MORE PHOTOS

Crews uncovered signs of a long-forgotten fire during interior demolition at 635 Cleveland Street, revealing burn marks and charred framing above the ceiling and on the walls.

Read more
MORE PHOTOS

Demolition crews at 639 Cleveland remove walls and finishes, revealing unexpected steel framing and a patchwork of materials beneath.

Read more
An exciting new chapter of historic restoration begins for four unique properties on Cleveland Street in Downtown Clearwater.