From panels to conduits, all outdated electrical has been stripped from 635 Cleveland Street.

Read more
MORE PHOTOS

High-ceiling drywall removal reveals roof trusses at 635 Cleveland Street.

Read more
MORE PHOTOS

Crews remove foam insulation from the ceiling at 635 Cleveland Street, exposing roof trusses.

Read more
MORE PHOTOS

Environmental concerns guided the removal of refrigerant before the vents and ductwork were demolished at 635 Cleveland Street.

Read more
MORE PHOTOS

The interior floor slab at 635 Cleveland Street is demolished and removed to clear the ground floor.

Read more
MORE PHOTOS

The kitchen hood and ductwork at 635 Cleveland Street have been removed, preparing the space for renovation.

Read more
MORE PHOTOS

Structural truss removal marks a major interior demolition milestone in the renovation of 635 Cleveland Street.

Read more
MORE PHOTOS

Crews removed sections of brick at 635 Cleveland Street to examine the building’s integrity, revealing structural concerns that require stabilization.

Read more
MORE PHOTOS

Truss inspections begin as crews remove the ceiling at 635 Cleveland Street.

Read more

Sound- and temperature-insulated plumbing is removed from the upstairs of 639 Cleveland Street.

Read more
MORE PHOTOS

Another layer of demolition completes, preparing the interior for its next stage of construction.

Read more
MORE PHOTOS

After stripping drywall and stucco, demolition crews removed the entire wood framing system inside 635 Cleveland Street.

Read more
MORE PHOTOS

The recessed back entry at 635 Cleveland is demolished, opening up more usable space under the former mezzanine.

Read more
MORE PHOTOS

Old ducts and compressors are gone as another 600 Block structure is prepared for renewal.

Read more
MORE PHOTOS

Crews remove non-load-bearing steel support columns from the interior of 635 Cleveland Street, clearing the way for layout preparation and framing in the next stage of transformation.

Read more
MORE PHOTOS

Crews remove all fiberglass insulation from 639 Cleveland Street as part of the full interior demolition, clearing the way for sustainable material upgrades in the building’s renovation phase.

Read more
MORE PHOTOS

Crews remove the floor tile at 623 Cleveland Street to expose the subfloor and allow for detailed architectural assessments ahead of interior layout design.

Read more
MORE PHOTOS

Crews remove ceramic floor tile at 635 Cleveland Street, exposing the underlying concrete slab in preparation for finish work.

Read more
MORE PHOTOS

Crews remove the back structure and all of the remaining studs at 635 Cleveland Street.

Read more
MORE PHOTOS

Crews remove the outer brick from the chimney, uncovering the original brickwork.

Read more
An exciting new chapter of historic restoration begins for four unique properties on Cleveland Street in Downtown Clearwater.
See the magnificent transformation now underway