July 27, 2026 • 600 Block
Crews remove an existing concrete column from the front façade of 639 Cleveland Street as redevelopment preparation advances. Using heavy equipment, the column is carefully separated from the structure and lifted away from the building. The removal clears the façade area and allows crews to continue preparing the building for the next phase of work.
Learn more about the 600 block redevelopment.
July 26, 2026 • 600 Block
July 21, 2026 • 600 Block
July 19, 2026 • 600 Block
July 18, 2026 • 600 Block
July 17, 2026 • 600 Block
July 13, 2026 • 600 Block