August 1, 2026 • 600 Block
At the base of the masonry walls, anchoring material secures new reinforcing bars before the wall cells are completed.
Read moreThe interior structure at 639 Cleveland Street continues to evolve as demolition crews clear existing elements for future work.
Read moreJuly 30, 2026 • 600 Block
Crews remove structural stair connections inside 639 Cleveland Street, separating existing steel components as interior demolition prepares the building for redevelopment.
Read moreJuly 29, 2026 • 600 Block
Another visible milestone takes shape on the 600 Block. At 639 Cleveland Street, east wall removal creates new views into the building.
Read moreCrews continue interior demolition at 639 Cleveland Street, removing concrete masonry walls in preparation for new structural improvements and stair installation.
Read moreCrews remove a concrete column from the front façade of 639 Cleveland Street, clearing the structure for continued redevelopment and future improvements.
Read moreJuly 26, 2026 • 600 Block
Demolition findings at 629–633 Cleveland Street reveal hidden wall conditions, leading to targeted reinforcement work that strengthens the building’s future structure.
Read moreJuly 22, 2026 • 600 Block
Dozens of A/C units are delivered to the 600 block site and staged for installation, marking continued progress on upgraded building systems.
Read moreCrews carefully dismantle the compromised west exterior wall at 639 Cleveland Street, combining hand demolition and heavy equipment to expose existing masonry conditions.
Read moreJuly 20, 2026 • 600 Block
A crane-assisted operation removes a concealed 45-foot steel beam from the 639 Cleveland Street façade, advancing demolition and preparing the building for its next phase of work.
Read moreCrews at 639 Cleveland Street have exposed the existing metal decking after removing the previous roof materials, allowing the team to prepare the surface for the next phase of roof installation.
Read moreJuly 18, 2026 • 600 Block
Crews remove accumulated roofing layers at 639 Cleveland Street, creating a clean surface for the installation of a new energy-efficient membrane system.
Read moreFaçade demolition at 639 Cleveland Street reveals a concealed steel support beam, documenting original construction methods.
Read moreRestoration craftsmen are preparing the Brown Brothers Building’s historic interior doors for refinishing, one careful pass at a time.
Read moreJuly 15, 2026 • 600 Block
Working from elevated platforms, demolition crews are carefully removing existing masonry sections as the building moves into its next phase of transformation.
Read moreSite preparation continues with the removal of existing steel beams, columns and framing on the 600 block.
Read moreA fabrication team uses CNC routing to prototype the three-dimensional aluminum composite panels planned for the exterior of 645 Cleveland Street.
Read moreJuly 9, 2026 • 600 Block
Preparations continue inside 639 Cleveland Street as crews install structural shoring before the next phase of demolition.
Read moreJuly 8, 2026 • 600 Block
Professional surveyors are documenting the 600 block’s topography and underground utilities, providing the precise site data needed to advance the next phase of redevelopment.
Read moreJuly 7, 2026 • 600 Block
Crews are stabilizing 623–627 Cleveland Street with temporary shoring, creating a safe foundation for the next phase of construction.