Inside EVO: The Hidden Engineering Behind the Big-Screen Experience Read →
Don’t miss what’s happening on Cleveland Street

Get updates as new projects and events unfold

Don’t miss what’s happening on Cleveland Street

November 27, 2026 • 600 Block

Storefront Entry Framing Takes Shape at 629–633 Cleveland Street

Worker welds steel connections within storefront framing.
A worker welds structural steel connections within the new entry framing at 629–633 Cleveland Street.

Galvanized storefront steel is being welded together at the entry of 629–633 Cleveland Street. Workers secure each piece as the new storefront assembly takes shape, creating a structurally sound framework. The connections tie the individual steel components into a unified entry structure and prepare the storefront for subsequent construction.

Welder secures steel connection beneath storefront framing.
A welder secures a steel connection beneath the new storefront framing.

Learn more about the redevelopment plans for the 600 block.

Restoration Updates

See daily progress on Historic Cleveland Street