Workers continue clearing the second floor of the Brown Brothers Building, preparing the space for the next phase of restoration work.
Read moreMarch 11, 2026 • Brown Brothers
Interior demolition continues inside the Brown Brothers Building as lath and plaster walls are removed from the second floor.
Read moreBehind the walls of the Brown Brothers Building, crews are clearing dated electrical systems to make way for updated lighting and wiring during restoration.
Read moreCrews continue interior demolition inside the Brown Brothers Building, removing drywall and insulation to expose framing and open the structure for further restoration work.
Read moreCrews employ compact equipment inside the Brown Brothers Building to accelerate demolition and debris removal.
Read moreFebruary 27, 2026 • Brown Brothers
Interior cleanup moves forward at the Brown Brothers building as restoration continues.
Read moreFebruary 23, 2026 • Brown Brothers
Crews prepare the Brown Brothers building for its next demolition phase by clearing debris and organizing the site.
Read moreSeptember 23, 2025 • Brown Brothers
The first floor drywall at the Brown Brothers Building has been removed, exposing framing and the mechanical, electrical and plumbing systems for the structure’s next stage of restoration.
Read moreSeptember 6, 2025 • Brown Brothers
The first-floor cleanout of demolition debris at the Brown Brothers Building is underway, preparing the space for restoration.
Read moreCrews are clearing away demolition debris into a 30-yard dumpster at the Brown Brothers Building.
Read moreRestoration of the Brown Brothers Building uncovers original brick walls on the second floor.
Read moreAugust 23, 2025 • Brown Brothers
Crews remove the north-side lath-and-plaster walls on the second floor of the Brown Brothers Building, revealing an earlier construction method tougher than drywall.
Read moreAugust 18, 2025 • Brown Brothers
Selected interior wall studs are being removed from the Brown Brothers Building following the stripping of drywall and stucco finishes.
Read moreAugust 13, 2025 • Brown Brothers
Crews remove several dozen second-floor wooden doors and frames not slated for restoration as part of the Brown Brothers Building transformation.
August 10, 2025 • Brown Brothers
An HVAC inspection conducted at the Brown Brothers Building is a preparatory step ahead of full system removal.
Read moreRestoration continues at 615 Cleveland as the non-structural walls on the second floor are being removed to prepare for the next phase of restoration.
Read moreAugust 2, 2025 • Brown Brothers
Demolition is underway inside 619 Cleveland Street, where crews are removing drywall and exposing framing for future replacement.
Read moreJuly 29, 2025 • Brown Brothers
Brown Brothers Building restoration crews remove the partition wall between two storefront units, marking a major interior space shift.
Read moreJuly 24, 2025 • Brown Brothers
Crews remove the back bathroom in the 617 unit of Brown Brothers Building, clearing non-original framing and plumbing for future interior updates.
Read moreCrews are removing interior wood and stucco walls at the Brown Brothers Building, thus clearing the way for structural assessment and future reconstruction.
Read more