November 3, 2026 • 600 Block
Foundation work continues at 635 Cleveland Street as crews install reinforcing steel within the west wall footing forms. Workers are positioning and securing the bars inside the prepared forms, creating the steel framework that will be embedded in the concrete. This work follows excavation, soil compaction and formwork along the west perimeter, with concrete placement to follow.
Learn more about the redevelopment plans for the 600 block.
October 31, 2026 • 600 Block
October 30, 2026 • 600 Block