September 13, 2025 • F.W. Woolworth Co.
On the west side of the Woolworth building, contractors have started installing a fresh stucco finish. Scaffolding was set up along the wall to allow safe access. Before application, crews removed imperfections from the exterior surface, ensuring it was flat and free of peeling paint or protrusions.
Expansion joints were installed to allow the stucco to expand and contract with temperature changes, reducing the risk of fractures. Reinforcing mesh was also embedded in the fresh stucco layer. This mesh strengthens the finish and provides long-term durability, helping the restored wall resist cracking as the building ages.
 
 
Learn more about the full restoration plan for the F.W. Woolworth Co. building.
 