August 13, 2026 • 600 Block
Crews are removing sections of the existing floor slab and tile at 635 Cleveland Street using an excavator. The work includes breaking apart and removing the concrete slab along with remaining tile and surface materials. As demolition progresses, the exposed area prepares the building for the next stages of site preparation and construction.
Learn more about the restoration plans for the 600 block.
September 27, 2026 • 600 Block
September 26, 2026 • 600 Block
September 25, 2026 • 600 Block
September 24, 2026 • 600 Block
September 23, 2026 • 600 Block
September 22, 2026 • 600 Block
September 21, 2026 • 600 Block
September 21, 2026 • 600 Block
September 19, 2026 • 600 Block
September 18, 2026 • 600 Block
See daily progress on Historic Cleveland Street