Major Announcement: Cleveland Street Alliance Expands Public Access to Downtown Clearwater Redevelopment Updates Read →
Don’t miss what’s happening on Cleveland Street

Get updates as new projects and events unfold

Don’t miss what’s happening on Cleveland Street

December 25, 2025 • F.W. Woolworth Co.

Period-Inspired Gooseneck Lighting Installed at the Woolworth Building

Gooseneck light beside door.
Gooseneck light mounted beside the storefront entrance.

Crews at the Woolworth building have installed new period-inspired gooseneck lights along the front storefront, adding both character and functionality to the exterior. Positioned on each side of the entry doors, the fixtures provide focused illumination while reinforcing the building’s historic look. Installation began with securing a mounting base to the exterior wall, followed by attaching each LED gooseneck fixture and ensuring it was firmly anchored. Crews then sealed the edges of each base to protect against weather exposure. With the lighting now in place, the storefront gains improved visibility and a finished appearance that reflects the building’s restored design.

Sealed light mounting base.

Sealed mounting base ensures weather protection for the fixture.

Learn more about the full restoration plan for the F.W. Woolworth Co. building.

Restoration Updates

See daily progress on Historic Cleveland Street