September 9, 2025 • Peoples Bank
Crews at the Peoples Bank Building are installing electrical box supports as part of the interior construction. On the first floor, supports are set between vertical metal framing studs, creating a stable structure to hold junction boxes.
Once the boxes are in place, crews will run electrical wiring through the framing system. With steady progress on the first floor, installation will soon move to the second floor.
Learn more about the full restoration plan for the Peoples Bank building.