Paver Base Layer Forms Foundation for Peoples Bank Sidewalk

Worker uses loader to place sidewalk base material.
A crew member operates a compact loader to distribute paver base material along the Peoples Bank.

Crews prepare the sidewalk area at Peoples Bank for a new paver walkway by spreading and compacting the base material. The paver base creates a stable foundation that supports proper placement and the long-term performance of the finished surface. This detailed preparation work follows the installation of the new concrete curb and advances the ongoing streetscape improvements along Cleveland Street.

Workers spread paver base material beside Peoples Bank.
Aggregate base material is spread across the sidewalk area before new paver installation.

Learn more about the full restoration of Peoples Bank.