September 24, 2026 • 600 Block
At 629–633 Cleveland Street, crews are restoring sections of the existing interior floor that were opened during earlier construction work. The concrete pourback closes these areas and ties the repaired sections into the surrounding floor. With the openings filled and the surface finished, the repaired sections now connect with the existing floor as work progresses.
Learn more about the redevelopment plans for the 600 block.
September 23, 2026 • 600 Block
September 22, 2026 • 600 Block
September 21, 2026 • 600 Block
September 21, 2026 • 600 Block
September 19, 2026 • 600 Block
September 18, 2026 • 600 Block
September 17, 2026 • 600 Block
September 15, 2026 • 600 Block
September 14, 2026 • 600 Block
See daily progress on Historic Cleveland Street