August 28, 2025 • Peoples Bank
The electrical team at the Peoples Bank building is installing junction and outlet boxes. They are being set in place on the metal wall frames to allow conduits to run throughout the building. Electricians are preparing the external electrical panels for internal wiring. This step marks a key stage in readying the building for updated electrical systems.
Learn more about the full restoration plan for the Peoples Bank building.