NEW Major Announcement: DEMOLITION UNDERWAY AT FUTURE SITE OF $50M EVO ENTERTAINMENT DESTINATION Read →
Don’t miss what’s happening on Cleveland Street

Get updates as new projects and events unfold

Don’t miss what’s happening on Cleveland Street

May 6, 2026 • Peoples Bank

Metal Stud Framing Takes Shape Inside the Peoples Bank Building

Worker secures vertical metal stud beside window opening.
Worker secures vertical metal stud beside window opening. 

Interior renovation continues inside the Peoples Bank Building as crews install metal framing along newly defined wall lines and window openings. Using a level and specialized tools, crew members align and fasten vertical studs, ensuring each section is securely and evenly anchored before drywall installation begins.

This stage establishes the final depth and clean edges of the interior walls, preparing the space for finished surfaces and architectural detailing.

Metal stud fastened to floor track during framing process.
Lower stud anchored into floor track for stability. 

Learn more about the full restoration plan for the Peoples Bank Building.

Restoration Updates

See daily progress on Historic Cleveland Street