Cleveland Street Alliance

INTERIOR

See daily progress on Historic Cleveland Street

MORE PHOTOS

Specialists remove fasteners and debris from historic wood studs inside the Brown Brothers Building, preparing original framing for restoration and fresh use.

Read more
MORE PHOTOS

Structured rows of resilient channels mark the next stage of interior restoration at the Peoples Bank building.

Read more
MORE PHOTOS

Wall removal around window openings at the Brown Brothers Building reveals original brick masonry, wood lath and framing behind the historic façade.

Read more
MORE PHOTOS

A defining interior element takes shape as patterned tile flooring extends through the Peoples Bank building corridor.

Read more
MORE PHOTOS

Layer by layer, the second-floor restrooms walls at the Brown Brothers Building are opened up for restoration. Earlier materials are beginning to reappear.

Read more
MORE PHOTOS

A piece of Clearwater’s past surfaces as newspaper fragments are uncovered during work at the Brown Brothers Building.

Read more
MORE PHOTOS

Additional sections of plaster ceiling are removed, expanding a view of the building’s historic structure.

Read more

Interior demolition at the Brown Brothers Building continues with plaster removal, exposing historic materials and construction details.

Read more
MORE PHOTOS

The roof system is coming into view as second-floor ceiling removal continues at the Brown Brothers Building.

Read more
MORE PHOTOS

Precision framing work continues as crews install the metal ceiling grid throughout the Peoples Bank interior.

Read more
MORE PHOTOS

Interior demolition continues at the Brown Brothers Building as crews expose framing hidden behind ceiling installations.

Read more
MORE PHOTOS

Electricians are advancing the lighting system at the Peoples Bank building, completing connections and positioning fixtures within the ceiling framework. 

Read more
MORE PHOTOS

The Brown Brothers Building moves into a new phase as ceiling fixtures are cleared for a roof system assessment.

Read more
MORE PHOTOS

Wall panels and built-in elements are being removed inside the Brown Brothers Building, restoring the space to a clean baseline for reconstruction.

Read more
MORE PHOTOS

Behind the walls, the electrical system is coming together at the Peoples Bank building, thus setting the stage for lighting and power.

Read more
MORE PHOTOS

Each layer removed at the Brown Brothers Building brings the space closer to restoration-ready conditions.

Read more
MORE PHOTOS

Critical infrastructure is coming together as HVAC installation continues inside the Peoples Bank building.

Read more
MORE PHOTOS

Interior spaces are opening up as crews remove wood framing and debris from the Brown Brothers Building.

Read more
MORE PHOTOS

Interior walls begin to form as metal stud framing establishes the layout of future tenant spaces at the Peoples Bank building.

Read more
MORE PHOTOS

Metal framework installation is shaping the future air distribution system inside the Peoples Bank building.

Read more