March 12, 2026 • Peoples Bank
The framework supporting the roof eave is taking shape along the upper façade of the historic Peoples Bank building as restoration continues. Crews are installing triangular wood framing pieces that extend outward from the building, forming the structural base for the overhanging roof edge.
Each piece is anchored to a ledger board mounted along the wall and reinforced with metal connector plates that secure the framing in place. Once complete, the framework will support the barrel tile roof edge, restoring a defining Mediterranean Revival feature also seen on the nearby historic Cleveland Street Post Office.
Learn more about the full restoration plan for the Peoples Bank building.
April 21, 2026 • Peoples Bank
April 20, 2026 • Peoples Bank
April 17, 2026 • Peoples Bank
April 15, 2026 • Peoples Bank
April 14, 2026 • Peoples Bank
April 11, 2026 • Peoples Bank
April 10, 2026 • Peoples Bank
April 7, 2026 • Peoples Bank
April 5, 2026 • Peoples Bank