Technicians have installed new rooftop drainage lines that carry condensation away from the AC units at the Woolworth building. The drainage system uses PVC fittings bonded with liquid cement to create a sealed pathway starting from the unit’s drain outlet. The drainage line was secured to sloped rooftop supports routing water toward the roof gutter. This system ensures humidity produced by the cooling system is collected and redirected, preventing roof damage, rust and ceiling leaks.
Pipes are connected to the drain outlet on the AC units.
Fittings sealed with liquid cement for a watertight connection.
Learn more about the full restoration plan for the F.W. Woolworth Co. building.
November 22, 2025 • F.W. Woolworth Co.
November 20, 2025 • F.W. Woolworth Co.
November 16, 2025 • F.W. Woolworth Co.
November 14, 2025 • F.W. Woolworth Co.
November 12, 2025 • F.W. Woolworth Co.
November 10, 2025 • F.W. Woolworth Co.
November 8, 2025 • F.W. Woolworth Co.
November 6, 2025 • F.W. Woolworth Co.
November 5, 2025 • F.W. Woolworth Co.