Boyd’s Clocks secured the historic clock brackets to the Peoples Bank, ensuring long-term stability for the landmark feature.

Read more
MORE PHOTOS

Crews at the Peoples Bank building completed electrical installation by placing junction and outlet boxes on new framing.

Read more
MORE PHOTOS

Plumbing crews installed a cast-iron storm drainage system at the Peoples Bank building, ensuring reliable water runoff management for the restored landmark.

Read more
MORE PHOTOS

Metal framing crews are making rapid progress at the Peoples Bank building, with wall structures taking shape on both the first and second floors.

Read more
MORE PHOTOS

Chalk lines and spray paint are used to mark the wall locations at Peoples Bank, starting the framing work.

Read more
MORE PHOTOS

Second-floor copper water lines are being installed at the Peoples Bank building with a press-fit system for secure, efficient connections.

Read more
MORE PHOTOS

Plumbers have started rough-in work on the second floor of the Peoples Bank, following the completion of underground lines. Crews are dry-fitting pipes and preparing for final connections.

Read more
MORE PHOTOS

Following two months of repair, the scaffolding and overhead protection at the historic Peoples Bank building has been removed, revealing its refreshed exterior and returning its full visual presence to Cleveland Street.

Read more
MORE PHOTOS

Crews complete second-floor decking repairs at the Peoples Bank building, leveling the trusses and installing new materials.

Read more
MORE PHOTOS

Window bucks are being installed at the Peoples Bank building, setting the stage for new windows as part of the ongoing restoration.

Read more
MORE PHOTOS

Crews complete critical wall preparation at the Peoples Bank Building, covering the brick face with mortar in advance of waterproofing and stucco installation.

Read more
MORE PHOTOS

Crews pour a concrete slab around the installed grease traps at the Peoples Bank building, completing another key step in the building’s infrastructure work.

Read more
MORE PHOTOS

Crews reinforce the exposed west wall of the Peoples Bank building with concrete blocks and begin framing new utility corridors.

Read more
MORE PHOTOS

Structural steel installation is completed inside the historic Peoples Bank building, reinforcing the structure.

Read more
MORE PHOTOS

Grease traps installation completes beneath the ground-floor slab at the Peoples Bank building.

Read more
MORE PHOTOS

The elevator shaft at Peoples Bank was fully rebuilt with reinforced concrete block walls and a new foundation.

Read more
MORE PHOTOS

The east wall of the Peoples Bank building is rebuilt using reinforced concrete blocks.

Read more

A portion of the roof at Peoples Bank was removed and replaced with angled planks and sheathing, both of which encourage proper stormwater drainage.

Read more
MORE PHOTOS

Crews are rebuilding a section of the east wall at Peoples Bank, reinforcing its foundation and preparing it to support key upper-level architectural elements.

Read more
MORE PHOTOS

New underground plumbing has been installed at the Peoples Bank building, including piping for restrooms, clearing the way for slab preparations and future tenant-ready infrastructure.

Read more