July 4, 2025 • Peoples Bank
Crews at the historic Peoples Bank building completed another important step in the restoration process by installing and leveling two grease traps and preparing the surrounding area for a concrete pour. This included forming the slab edges and installing structural reinforcements to ensure stability and durability. Once the framework was in place, concrete was poured, creating a new slab that integrated the grease traps seamlessly into the evolving structure.
Rebar was installed on the ground and around the grease traps in preparation for the concrete slab pour.