October 16, 2025 • Peoples Bank
At the Peoples Bank building, crews are completing ductwork installation across the second floor. Each section is carefully measured and fitted, with all joints sealed using specialized tape to ensure a tight, efficient system. Crews are working systematically from one end of the floor to the other, connecting each piece to form a continuous network that will deliver balanced airflow throughout every room. Once complete, the system will provide reliable, energy-efficient ventilation to support the restored interior spaces.
Learn more about the full restoration plan for the Peoples Bank building.
January 14, 2026 • Peoples Bank
January 13, 2026 • Peoples Bank
January 12, 2026 • Peoples Bank
January 10, 2026 • Peoples Bank
January 8, 2026 • Peoples Bank
January 6, 2026 • Peoples Bank
January 4, 2026 • Peoples Bank
January 3, 2026 • Peoples Bank
January 1, 2026 • Peoples Bank
December 30, 2025 • Peoples Bank