May 20, 2025 • The Telephone Building
Restoration crews have completed a key phase at the Telephone Building: installing the new cantilevered awning and its aluminum roof panels. Each panel was precisely fitted and mounted to the restored steel framework using durable, environmentally friendly materials.
This step reintroduces a signature 1914 element—a wraparound canopy originally suspended by tie rods and brackets. The aluminum roof offers modern resilience while honoring the building’s historic design.
See the full restoration plans for the Telephone Building.
June 29, 2025 • The Telephone Building
June 24, 2025 • The Telephone Building
June 19, 2025 • The Telephone Building
June 14, 2025 • The Telephone Building
June 9, 2025 • The Telephone Building
June 4, 2025 • The Telephone Building
May 31, 2025 • The Telephone Building
May 26, 2025 • The Telephone Building
May 17, 2025 • The Telephone Building
May 17, 2025 • The Telephone Building