May 12, 2025 • Peoples Bank
Restoration crews began cutting into the east wall of the second floor at the Peoples Bank building. The precision cuts are designed to ensure an easily controlled and stable demolition process. The full façade is now prepared for removal, with demolition scheduled to follow in the coming days.
Learn more about the full restoration plan for Peoples Bank.
May 28, 2025 • Peoples Bank
May 21, 2025 • Peoples Bank
May 11, 2025 • Peoples Bank