November 13, 2025 • Peoples Bank
Electricians at the Peoples Bank building are installing flexible metal conduits across the second-floor ceilings to power future office spaces. The conduits connect a network of preinstalled electrical boxes that will bring power to lighting, outlets and appliances throughout the restored rooms. Each conduit section is measured and routed precisely before wires are pulled through and fitted into the electrical boxes. The lines run back to the main electrical closet, ensuring power flows efficiently to every section of the floor. This phase brings modern electrical capability to the historic structure, supporting both restoration and long-term safe functionality for future tenants.
Learn more about the full restoration plan for the Peoples Bank building.
December 3, 2025 • Peoples Bank
November 30, 2025 • Peoples Bank
November 26, 2025 • Peoples Bank
November 21, 2025 • Peoples Bank
November 15, 2025 • Peoples Bank
November 11, 2025 • Peoples Bank
November 9, 2025 • Peoples Bank
November 7, 2025 • Peoples Bank
November 3, 2025 • Peoples Bank