March 8, 2026 • Peoples Bank
Wood block framing is being installed along the east wall of the historic Peoples Bank building as preparation continues for the reconstructed façade. The blocks are carefully anchored into the concrete structure to create a consistent framework that will support the next exterior layers.
A taut measuring string guides the alignment, ensuring the framing is positioned precisely before plywood sheathing is installed. This framework will provide the base for the façade system and final exterior finish.
Learn more about the full restoration plan for the Peoples Bank building.
June 7, 2026 • Peoples Bank
June 6, 2026 • Peoples Bank
June 5, 2026 • Peoples Bank
June 3, 2026 • Peoples Bank
May 31, 2026 • Peoples Bank
May 30, 2026 • Peoples Bank
See daily progress on Historic Cleveland Street