Get updates as new projects and events unfold
Receive updates on new developments, events and announcements as they happen.
A confirmation email has been sent to your inbox. If you do not receive it shortly, please check your spam or junk folder.
See daily progress on Historic Cleveland Street
Decorative ceiling features and restored wall surfaces come together inside the Peoples Bank Building as crew members complete detailed touch-up work throughout multiple rooms.
Read moreMay 18, 2026 • Peoples Bank
Interior base trim installation is underway throughout multiple finished areas of the Peoples Bank Building, giving a defining edge to each room.
Read moreInterior spaces inside the Peoples Bank building take on their finished appearance as painting crews move room by room through the restoration.
Read moreConcrete floor preparation work is underway inside the Peoples Bank Building as crews scrape away remaining adhesive and surface coatings throughout the structure.
Read moreNewly painted walls and corridors begin to reveal the restored interior layout inside the Peoples Bank Building restoration project.
Read moreDrywall sanding progresses inside the historic Peoples Bank Building as crews prepare the renovated interior for primer, paint and finish work.
Read moreMay 11, 2026 • Peoples Bank
The Peoples Bank Building interior gains color, texture and architectural depth through a carefully grouted terracotta tile frieze.
Read moreAbove the ceiling grid at the Peoples Bank building, copper refrigerant lines are joined through precision brazing—an essential step in the building’s HVAC installation.
Read moreHistoric brickwork and modern steel framing come together inside the Peoples Bank Building as staircase rail installation progresses.
Read moreThe second floor of the Peoples Bank Building receives drywall finishing, marking a visible step in the ongoing restoration of this 1910 landmark on Cleveland Street.
Read morePrecision framing work continues inside the Peoples Bank Building, establishing clean lines for walls and window openings.
Read moreThe cantilevered awning at the Peoples Bank Building receives detailed finishing, with crew members coating each panel and support.
Read moreTile installation is underway at the Peoples Bank Building, as crews align and secure interior wall finishes in the second-floor restrooms.
Read moreExterior finish work sharpens the historic look of the Peoples Bank Building’s roof overhang.
Read moreMechanical installation is taking shape inside the Peoples Bank Building as specialists begin assembling new air distribution components.
Read moreApril 26, 2026 • Peoples Bank
Careful sealing of trim and panel joints strengthens the Peoples Bank Building façade ahead of applying final finishes.
Read moreThe Peoples Bank Building roofline approaches completion as barrel tiles are fastened into place.
Read moreApril 20, 2026 • Peoples Bank
Precision layout guides electrical installation inside the Peoples Bank Building, where conduit is routed through the framing system.
Read moreApril 17, 2026 • Peoples Bank
Structured rows of resilient channels mark the next stage of interior restoration at the Peoples Bank building.
Read moreApril 15, 2026 • Peoples Bank
The Peoples Bank building begins to regain its Mediterranean Revival character as barrel roof tiles are installed in precise rows.
Read more