April 2, 2026 • Brown Brothers
Ceiling fan removal has begun throughout the Brown Brothers Building as part of preparations for a structural review of the roof system. The fixtures are carefully disconnected and dismantled prior to the removal of the ceiling, which is necessary to allow for assessment of the roof system.
With the fans removed, crews can proceed with removing ceiling drywall, exposing the structure above for contractors to assess its condition, support system and any required repairs. This step will determine whether portions of the roof will need to be reinforced or replaced as the restoration progresses.
By clearing these mechanical fixtures and opening the ceiling, the project advances beyond interior demolition into a more technical phase—where structural integrity and long-term performance are evaluated before reconstruction begins.
Learn more about the full restoration plan for the Brown Brothers Building.
April 24, 2026 • Brown Brothers
April 19, 2026 • Brown Brothers
April 18, 2026 • Brown Brothers
April 16, 2026 • Brown Brothers
April 13, 2026 • Brown Brothers
April 12, 2026 • Brown Brothers
April 9, 2026 • Brown Brothers
April 8, 2026 • Brown Brothers
April 6, 2026 • Brown Brothers
April 4, 2026 • Brown Brothers
See daily progress on Historic Cleveland Street