Restoration Updates

See daily progress on Historic Cleveland Street

MORE PHOTOS

Interior spaces inside the Peoples Bank building take on their finished appearance as painting crews move room by room through the restoration.

Read more
MORE PHOTOS

Specialists apply plaster to interior wall panels inside the Peoples Bank building, adding texture and a decorative finish to the restored space.

Read more
MORE PHOTOS

Concrete floor preparation work is underway inside the Peoples Bank Building as crews scrape away remaining adhesive and surface coatings throughout the structure.

Read more
MORE PHOTOS

Newly painted walls and corridors begin to reveal the restored interior layout inside the Peoples Bank Building restoration project.

Read more
MORE PHOTOS

Drywall sanding progresses inside the historic Peoples Bank Building as crews prepare the renovated interior for primer, paint and finish work.

Read more
MORE PHOTOS

The Peoples Bank Building interior gains color, texture and architectural depth through a carefully grouted terracotta tile frieze.

Read more

Above the ceiling grid at the Peoples Bank building, copper refrigerant lines are joined through precision brazing—an essential step in the building’s HVAC installation.

Read more
MORE PHOTOS

Historic brickwork and modern steel framing come together inside the Peoples Bank Building as staircase rail installation progresses.

Read more
MORE PHOTOS

The second floor of the Peoples Bank Building receives drywall finishing, marking a visible step in the ongoing restoration of this 1910 landmark on Cleveland Street.

Read more
MORE PHOTOS

The Telephone Building gains a visible finishing detail as its mounted sign returns to the restored façade.

Read more
MORE PHOTOS

Precision framing work continues inside the Peoples Bank Building, establishing clean lines for walls and window openings.

Read more
MORE PHOTOS

Pedestrian pathways on the 600 block are cleared of existing pavers to prepare for cleaning and restoration.

Read more
MORE PHOTOS

The cantilevered awning at the Peoples Bank Building receives detailed finishing, with crew members coating each panel and support.

Read more
MORE PHOTOS

Tile installation is underway at the Peoples Bank Building, as crews align and secure interior wall finishes in the second-floor restrooms.

Read more
MORE PHOTOS

Exterior finish work sharpens the historic look of the Peoples Bank Building’s roof overhang.

Read more
MORE PHOTOS

The 600 block continues its major phase of demolition, opening each property for new construction.

Read more
MORE PHOTOS

Large-format graphics are installed along the 600 block construction fencing, presenting a cohesive visual preview of the redeveloped Cleveland Street corridor.

Read more
MORE PHOTOS

Materials are cut, cleared and consolidated as 635 Cleveland Street transitions from demolition into its next phase.

Read more
MORE PHOTOS

Mechanical installation is taking shape inside the Peoples Bank Building as specialists begin assembling new air distribution components.

Read more
MORE PHOTOS

Crews remove masonry and wall sections along the rear of 635 Cleveland Street, exposing underlying structural elements for reconstruction.

Read more