Get updates as new projects and events unfold
Receive updates on new developments, events and announcements as they happen.
A confirmation email has been sent to your inbox. If you do not receive it shortly, please check your spam or junk folder.
See daily progress on Historic Cleveland Street
A fabrication team uses CNC routing to prototype the three-dimensional aluminum composite panels planned for the exterior of 645 Cleveland Street.
Read moreExterior utility lines are coming down at the Brown Brothers Building as restoration work advances in downtown Clearwater.
Read moreJuly 11, 2026 • Brown Brothers
Original door hardware from the Brown Brothers Building is being cleaned and restored, including antique P. F. Corbin mortise locks dating as early as 1927.
Read moreRestoration crews are taking the next step in preserving the Brown Brothers Building by collecting mortar samples for expert analysis.
Read moreJuly 9, 2026 • 600 Block
Preparations continue inside 639 Cleveland Street as crews install structural shoring before the next phase of demolition.
Read moreJuly 8, 2026 • 600 Block
Professional surveyors are documenting the 600 block’s topography and underground utilities, providing the precise site data needed to advance the next phase of redevelopment.
Read moreJuly 7, 2026 • 600 Block
Crews are stabilizing 623–627 Cleveland Street with temporary shoring, creating a safe foundation for the next phase of construction.
Read moreJuly 6, 2026 • 600 Block
Forklifts, trucks and neatly stacked masonry units show the 600 block moving steadily through its renovation sequence.
Read moreJuly 5, 2026 • 600 Block
Crews remove the entry wall at 629–633 Cleveland Street, opening space for the recessed, curved storefront entry planned for the 600 block.
Read moreSpecialized restoration work is underway on the Peoples Bank clock as copper components are cleaned and treated to recreate their historic blue-green patina.
Read moreJuly 3, 2026 • 600 Block
Crews remove sections of the concrete floor slab at 629–633 Cleveland Street to prepare for underground plumbing installation.
Read moreJuly 2, 2026 • 600 Block
Utility trenching preparations are underway at 629–633 Cleveland Street.
Read moreNew green stained-glass panels are being matched, hand-cut and fitted as the Peoples Bank clock restoration advances.
Read moreContractors remove aging utility light poles from the rear parking areas of the 600 block, clearing the site and supporting ongoing demolition and redevelopment activities.
Read moreRemoval of the existing canopy at 629–633 Cleveland Street reveals former structural layers and prepares the storefront for its new curved entryway.
Read moreSpecialized cleaning removes residue and staining from the Peoples Bank clock’s copper elements, revealing the original metal for restoration.
Read moreJune 27, 2026 • Family Entertainment Center
Site preparation continues as demolition crews remove buried foundation elements and clear the property for future construction.
Read moreJune 26, 2026 • 600 Block
The front façade at 623–627 Cleveland Street is being carefully cleared for the next stage of work.
Read moreJune 26, 2026 • 600 Block
Visible progress continues on the 600 block: the roof at 629–633 Cleveland Street has been opened up for full replacement.
Read moreJune 25, 2026 • 600 Block
Roof deck removal clears the way for new decking and a watertight roof membrane at 623–627 Cleveland Street.
Read more