Crews remove demolition debris from the Brown Brothers Building, including wood, gypsum and plaster.

Read more
MORE PHOTOS

The elevator shaft at Peoples Bank was fully rebuilt with reinforced concrete block walls and a new foundation.

Read more
MORE PHOTOS

After extensive interior demolition, the lead architect conducted a full walkthrough of the 600 Block to document exposed structural features and finalize the restoration plans.

Read more
MORE PHOTOS

Crews demolished the outdated east stairwell at the Woolworth building and poured a new foundation to begin reconstructing it with concrete blocks.

Read more
MORE PHOTOS

Demolition crews uncover a heavy safe inside 645 Cleveland Street, dating back to the early 1900s and adding a new layer of discovery to the ongoing renovation.

Read more
MORE PHOTOS

Crews uncovered signs of a long-forgotten fire during interior demolition at 635 Cleveland Street, revealing burn marks and charred framing above the ceiling and on the walls.

Read more
MORE PHOTOS

Crews complete the two-phase removal of the Woolworth building’s elevator shaft and rooftop elevator room, restoring the historic structure’s original profile and clearing the way for future upgrades.

Read more
MORE PHOTOS

Crews demolish and prepare to rebuild the compromised east wall at the Peoples Bank, reinforcing the building’s stability while protecting the surrounding environment.