See daily progress on Historic Cleveland Street
January 1, 2026 • Peoples Bank
The south side of the Peoples Bank building is progressing with plastering and waterproofing.
Read moreDecember 30, 2025 • Peoples Bank
Another key milestone is completed with the installation of south storefront doors and glass at the Peoples Bank building.
Read moreDecember 28, 2025 • Peoples Bank
Crews install tinted, heat-treated glass in the east storefront doors at the Peoples Bank building, improving future safety and comfort.
Read moreDecember 26, 2025 • Peoples Bank
Behind-the-scenes work is underway to protect the Peoples Bank building from future water intrusion.
Read moreDecember 24, 2025 • Peoples Bank
Crews install drywall around the elevator landing at the Peoples Bank, preparing the area for paint.
Read moreDecember 22, 2025 • Peoples Bank
Street-level progress continues with storefront doors installed at the Peoples Bank building.
Read moreDecember 21, 2025 • Peoples Bank
Work continues on the Peoples Bank building as steel ledges prepare the façade for mosaic tiles.
Read moreDecember 18, 2025 • Peoples Bank
Crews craned new air-conditioning units onto the roof of the Peoples Bank building, marking a major milestone in the building’s mechanical upgrades.
Read moreDecember 15, 2025 • Peoples Bank
Concrete floor preparation is underway at the Peoples Bank building where the east storefront will be installed.
Read moreDecember 11, 2025 • Peoples Bank
The Peoples Bank building’s Mediterranean Revival tile design is being mapped across the east façade.
Read moreDecember 3, 2025 • Peoples Bank
Carpenters completed building the east staircase frame at the Peoples Bank building.
Read moreNovember 30, 2025 • Peoples Bank
Chalk lines now mark the layout for the mosaic tile façade at the Peoples Bank building.
Read moreNovember 26, 2025 • Peoples Bank
Carpenters are forming the structural base of the Peoples Bank building east staircase with fresh lumber and precision cuts.
Read moreNovember 21, 2025 • Peoples Bank
Demolition is complete and reconstruction is getting underway on the east staircase at the Peoples Bank building.
Read moreNovember 19, 2025 • Peoples Bank
The new elevator cab at the Peoples Bank building has been fully assembled, with guide rails, drive systems and interior components installed.
Read moreNovember 15, 2025 • Peoples Bank
Vital prep work begins for the modern elevator inside the historic Peoples Bank building.
Read moreNovember 13, 2025 • Peoples Bank
Electricians install conduit and wiring across the Peoples Bank building’s second floor, preparing for lighting and outlets.
Read moreNovember 11, 2025 • Peoples Bank
A smooth floor surface takes shape as crews complete the concrete pour at the Peoples Bank building.
Read moreNovember 9, 2025 • Peoples Bank
Crews install historically accurate second-floor windows at the Peoples Bank building, combining authentic design with modern performance in a major step toward the project’s completion.
Read moreNovember 7, 2025 • Peoples Bank
Step by step, the Peoples Bank restoration moves forward with precise window framing and sealing.
Read more