Crews at the Woolworth building are framing the first floor to form stable walls for the next phase of restoration.

Read more
MORE PHOTOS

Crews at the Peoples Bank building are preparing to install junction boxes and wiring as part of the second floor electrical utility installation.

Read more
MORE PHOTOS

The first floor drywall at the Brown Brothers Building has been removed, exposing framing and the mechanical, electrical and plumbing systems for the structure’s next stage of restoration.

Read more
MORE PHOTOS

A layer of concrete strengthens and soundproofs the Woolworth building’s second floor.

Read more
MORE PHOTOS

Progress continues inside the Peoples Bank building with HVAC airflow pathways secured and sealed.

Read more
MORE PHOTOS

From panels to conduits, all outdated electrical has been stripped from 635 Cleveland Street.

Read more
MORE PHOTOS

To prevent leaks into the first floor, crews sealed openings before pouring the Woolworth building‘s second-floor concrete.

Read more
MORE PHOTOS

Interior renovation at the Peoples Bank building is advancing with electrical box support installation on the first floor.

Read more
MORE PHOTOS

The first-floor cleanout of demolition debris at the Brown Brothers Building is underway, preparing the space for restoration.

Read more
MORE PHOTOS

The interior floor slab at 635 Cleveland Street is demolished and removed to clear the ground floor.

Read more
MORE PHOTOS

Metal framing is installed around the structural beams at the Peoples Bank building, adding strength and preparing the walls for upcoming finishing procedures.

Read more
MORE PHOTOS

The kitchen hood and ductwork at 635 Cleveland Street have been removed, preparing the space for renovation.

Read more
MORE PHOTOS

Restoration of the Brown Brothers Building uncovers original brick walls on the second floor.

Read more
MORE PHOTOS

Crews remove the north-side lath-and-plaster walls on the second floor of the Brown Brothers Building, revealing an earlier construction method tougher than drywall.

Read more
MORE PHOTOS

Metal framing crews are making rapid progress at the Peoples Bank building, with wall structures taking shape on both the first and second floors.

Read more
MORE PHOTOS

Chalk lines and spray paint are used to mark the wall locations at Peoples Bank, starting the framing work.

Read more
MORE PHOTOS

Restoration crews rebuilt the south parapet of the F.W. Woolworth Co. building, adding a continuous bonding beam and installing framing to support sheathing and stucco.

Read more
MORE PHOTOS

Crews remove several dozen second-floor wooden doors and frames not slated for restoration as part of the Brown Brothers Building transformation. 

Read more
MORE PHOTOS

Second-floor copper water lines are being installed at the Peoples Bank building with a press-fit system for secure, efficient connections.

Read more
MORE PHOTOS

An HVAC inspection conducted at the Brown Brothers Building is a preparatory step ahead of full system removal.